The challenge
The roof system was failing on a metal roof covering a building of about 78,000 sq ft, over a plant that had to keep running.
What we did
- Recommended a tailored solution instead of a full replacement
- Replaced all 62 skylights
- Sealed every ridge vent with high-grade caulking made to bond with metal
- Planned fall protection and staging for high-risk work at height
The result
A tailored fix, delivered safely at height, while the manufacturer kept operating for the whole project.
Services in this project
More projects

HOA · TustinThe Williamshire HOAFourteen steep roofs, two old layers removed, finished ahead of schedule.Read the case study →

HOA · Santa AnaChestnut Square HOAA system change mid-project, agreed and delivered before the rains.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Municipal building · South PasadenaSouth Pasadena Public LibraryEvery targeted leak stopped, and years added to the roof.Read the case study →