HOA, 98 condominiums and townhomes · Tustin
The Williamshire HOA
Fourteen steep roofs, two old layers removed, finished ahead of schedule.

- Buildings
- 14, in seven courtyards
- Homes
- 98 units
- Scope
- Full tear-off and replacement
- Also
- Attic venting and gutters
- Completed
- 2022
The challenge
The board interviewed six roofing companies before choosing Hexagon. The roofs were steep, and under 30-year-old asphalt shingles sat the original wood shake roof: two layers to remove on every building, with residents living in every unit.
What we did
- Removed both roof layers, down to the deck, on all 14 buildings
- Installed new roof systems, attic venting and gutters
- Stayed reachable throughout: every question from the board got a quick answer
The result
The project was planned to run into the following year and was finished by the end of 2022. Four of the five board members later wrote about it publicly.
In the board's words
“We interviewed six different roofing companies and decided to hire Hexagon.”
“Very efficient and professional on such a large job, on top of getting it done way ahead of schedule.”
“Hexagon replaced all of the roofs in our HOA community in what I think is record time.”
“We are very impressed with the quality of workmanship and quick project completion of our very large HOA.”
From public Google reviews.
Services in this project
More projects

HOA · Santa AnaChestnut Square HOAA system change mid-project, agreed and delivered before the rains.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Industrial manufacturing facility · ChinoYamaseiki USAA failing metal roof restored while the factory kept running.Read the case study →

Municipal building · South PasadenaSouth Pasadena Public LibraryEvery targeted leak stopped, and years added to the roof.Read the case study →