HOA, 52 condominiums · Santa Ana
Chestnut Square HOA
A system change mid-project, agreed and delivered before the rains.

- System
- GAF EverGuard 60 mil TPO
- Insulation
- 2.5" ISO board with DensDeck
- Area
- About 25,000 sq ft, walls included
- Platforms
- 36 new AC platforms
- Completed
- 2026
The challenge
Once the old roof came off, conditions hidden under the sheathing meant the planned system was no longer the right one. The rainy season was weeks away.
What we did
- Switched to a self-adhered system and agreed the change with the HOA board quickly
- Coordinated the material exchange: several trucks, loading, offloading and remobilizing crews
- Installed 36 new AC platforms and custom metal gooseneck flashings
- Replaced every drain assembly
The result
The roof was covered before the rain arrived, and the project finished on time.
Services in this project
More projects

HOA · TustinThe Williamshire HOAFourteen steep roofs, two old layers removed, finished ahead of schedule.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Industrial manufacturing facility · ChinoYamaseiki USAA failing metal roof restored while the factory kept running.Read the case study →

Municipal building · South PasadenaSouth Pasadena Public LibraryEvery targeted leak stopped, and years added to the roof.Read the case study →