South Pasadena Public Library
Every targeted leak stopped, and years added to the roof.

- Roofs
- Foam with acrylic coating, and Spanish clay tile
- Approach
- Thorough inspection, targeted repairs
- Result
- 100% of targeted leaks stopped
The challenge
Leaks on a foam roof with an acrylic coating are notoriously hard to trace. The city wanted to extend the roof's life and delay a replacement.
What we did
- Inspected the whole roof and traced each leak to its source
- Repaired the foam with patches, three-course and polyester fabric on damaged areas
- Applied targeted primer and silicone coating patches
- Replaced selected flashings, including at the skylights, and sealed them with high-grade caulking
- Replaced sections of Spanish clay tile
The result
Every targeted leak stopped. The next year the city brought us back for the senior center.
Services in this project
More projects

HOA · TustinThe Williamshire HOAFourteen steep roofs, two old layers removed, finished ahead of schedule.Read the case study →

HOA · Santa AnaChestnut Square HOAA system change mid-project, agreed and delivered before the rains.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Industrial manufacturing facility · ChinoYamaseiki USAA failing metal roof restored while the factory kept running.Read the case study →