Post office · Sierra Madre
USPS Sierra Madre
The right system for the slope, installed in six days without closing.

- System
- Modified bitumen, light brown
- Area
- About 11,000 sq ft
- Duration
- 6 days
- Penetrations
- 6 HVAC platforms, 15 ducts
The challenge
Repeated leaks were affecting operations. We found the cause: asphalt shingles had been installed on a slope too low for them.
What we did
- Replaced the shingles with a modified bitumen system suited to the slope
- Chose a light brown finish to keep the building's look and fit the neighborhood
- Detailed around 6 HVAC platforms and 15 duct penetrations
- Ran multiple crews at once so the post office never had to close
The result
About 11,000 sq ft replaced in six days, with no interruption to the business.
Services in this project
More projects

HOA · TustinThe Williamshire HOAFourteen steep roofs, two old layers removed, finished ahead of schedule.Read the case study →

HOA · Santa AnaChestnut Square HOAA system change mid-project, agreed and delivered before the rains.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Industrial manufacturing facility · ChinoYamaseiki USAA failing metal roof restored while the factory kept running.Read the case study →