Office building · Arcadia
Coldwell Banker Realty
Original copper panels saved, and a failing joint between two roofs solved.

- Steep roof
- Copper standing seam, preserved and reinstalled
- Low slope
- Modified bitumen
- Area
- About 13,000 sq ft
The challenge
The seam where the copper roof met the low-slope roof had failed before, and the low-slope section did not drain well.
What we did
- Removed the copper standing seam panels and kept them
- Installed self-adhered underlayment and new flashing, then reinstalled the copper
- Replaced the low-slope roof with modified bitumen and designed a new transition between the two systems
- Corrected the slope, repositioned drains, and added custom skylights, a new HVAC platform and metal pans
The result
The building kept its copper roof, and the joint that had failed is now sealed and draining.
Services in this project
More projects

HOA · TustinThe Williamshire HOAFourteen steep roofs, two old layers removed, finished ahead of schedule.Read the case study →

HOA · Santa AnaChestnut Square HOAA system change mid-project, agreed and delivered before the rains.Read the case study →

HOA · ArcadiaSunny Spring Terrace HOAA detailed inspection first, then only the repairs the roof needed.Read the case study →

Industrial manufacturing facility · ChinoYamaseiki USAA failing metal roof restored while the factory kept running.Read the case study →